Image Alt

HNK - Building Paris

HNK - Building Paris

VG Projects completed the renovation of HNK Paris in Amsterdam Zuid-Oost within fourteen weeks with a sleek result. We were responsible for the demolition work, including the removal of construction and demolition waste. The job also included replacing door fittings, completely renovating the toilet groups, installing a new suspended ceiling, and metal stud walls. Finally, we levelled the subfloor, resulting in an even base for the new floor.

Area

500 m²

Duration project

3.5 months

d
Sed ut perspiclatis unde olnis iste errorbe ccusantium lorem ipsum dolor